South Plaza Pavilion at Toa Payoh Central
Durable, weather-resistant cladding for high-traffic public infrastructure.
The Challenge
Singapore’s public transport nodes are subjected to high humidity, heat, and massive foot traffic. The linkways required a ceiling and cladding material that could withstand the elements, resist dust accumulation, and remain low-maintenance for decades.
The Solution
3Co supplied High-Durability Aluminum Cladding for the linkways. Chosen for its corrosion resistance and structural integrity, the system ensures a safe and aesthetically pleasing commute for thousands of daily residents. The panels are designed for easy access to maintenance services located above the ceiling.


